Table 6.2 Cost comparison of the conventional sewerage scheme at Bryta and the low-cost sewerage system for Finikia
Item
Price (Drachmas)
BrytaFinikia
Earthworks
f817aef6aacbb5568cd649d8a3be3458.gif
Excavation
96122689
f817aef6aacbb5568cd649d8a3be3458.gif
Backfilling
64164439
Subtotal160287128 6628930
Pipes 1856227613649195
Inspection chambers 27943443 320000
Supplementary works 3027460 7677846
Total20982030728275971
Cost per m 43441 10038

6.5
Conclusions.
We have demonstrated the feasibility of constructing a shallow sewerage system suitable for a small rural community in Greece. The principal advantages of the system over conventional designs are its low costs and the short period needed for completion. When the system becomes operational in the near future, we will be able to gauge its effectiveness as a design guide for similar situations in Greece.
Acknowledgements
This project was made possible by funding from the European Community under the scheme MEDSPA 91-1/GR./012/GR./01 in collaboration with the Oia Community
6.6
Bibliography
f817aef6aacbb5568cd649d8a3be3458.gif
AGP Consultants (1993). Design of the Sewerage System for Bryta Community, Edessa Prefecture. Thessaloniki: AGP Consultants.
f817aef6aacbb5568cd649d8a3be3458.gif
Balafutas, G.G. and AGP Consultants (1993). Design of the Finikia Sanitary Sewer System: Phase A. Thessaloniki: AGP Consultants.

 